25 November 2010
This memo reports a 12-month forecast for the seasonally
adjusted Wisconsin unemployment rate. In addition to point forecasts (the
expected future value of the unemployment rate), the memo also reports 50% and
80% forecast intervals (probable ranges for future values).
The unemployment rate in September 2010 was 7.8%, holding
near constant for four month.
The forecasts fare summarized in Figure 1 and Table 1. The
point forecast is for the unemployment rate to decline very slowly over the
next year, dropping to 7.1% by October of 2011. The 80% forecast intervals show
that there is considerable additional uncertainty. In particular, there is a
significant probability that the unemployment rate will increase again starting
in May of 2011, possibly rising back up to 8.6% by August of 2011. There is
also a significant probability that the unemployment rate will continue to
fall, as low as 5.8% by October of 2011. The 50% forecast intervals refine this
uncertainty, showing that it is unlikely that the unemployment rate will rise
over 7.9%, could stay roughly constant over the next year, but could easily
fall to 6.0% by next October.
A 50% forecast interval is designed to contain the future
unemployment rate with 50% probability. It is just as likely for the rate to
fall in this interval as out of it. This is the smallest possible interval
which has even odds of containing the future rate. We can think of this
interval as “likely” to contain the future rate.
An 80% forecast interval is designed to contain the future
unemployment rate with 80% probability. We can think of this interval as
“highly likely” to contain the future rate. The 80% interval is designed so
that there is a 10% chance that the future value will be smaller than the
forecast interval, and a 10% chance that the future value will be larger than
the forecast interval.
Figure 1: Wisconsin Unemployment Rate Forecasts
TABLE 1: Wisconsin
Unemployment Rate Forecasts
|
History |
Point Forecast |
50% Interval Forecast |
80% Interval Forecast |
2010: 3 |
8.8% |
|
|
|
2010: 4 |
8.5% |
|||
2010: 5 |
8.2% |
|||
2010: 6 |
7.9% |
|||
2010: 7 |
7.9% |
|||
2010: 8 |
7.9% |
|||
2010: 9 |
7.8% |
|||
2010:10 |
7.8% |
|||
2010:11 |
|
7.8% |
(7.6%, 7.8%) |
(7.6%, 7.9%) |
2010:12 |
|
7.7% |
(7.5%, 7.8%) |
(7.4%, 7.9%) |
2011:1 |
|
7.7% |
(7.3%, 7.8%) |
(7.2%, 8.1%) |
2011:2 |
|
7.6% |
(7.1%, 7.9%) |
(7.0%, 8.1%) |
2011:3 |
|
7.5% |
(7.0%, 7.8%) |
(6.9%, 8.1%) |
2011:4 |
|
7.4% |
(6.9%, 7.8%) |
(6.7%, 8.1%) |
2011:5 |
|
7.4% |
(6.7%, 7.8%) |
(6.5%, 8.3%) |
2011:6 |
|
7.4% |
(6.6%, 7.9%) |
(6.5%, 8.4%) |
2011:7 |
|
7.4% |
(6.5%, 7.9%) |
(6.3%, 8.5%) |
2011:8 |
|
7.3% |
(6.4%, 7.9%) |
(6.2%, 8.6%) |
2011:9 |
|
7.2% |
(6.2%, 7.9%) |
(6.0%, 8.6%) |
2011:10 |
|
7.1% |
(6.0%, 7.8%) |
(5.8%, 8.6%) |
Previous Forecasts